6. In SAP system, Production data structures generated from SAP R/3 master data contains the following data?
A. Bill of material
B. Master recipe
C. Routing
D. All of the above
Answer : D

7. Which of the following is not a key activity of an operations manager?
A. Understanding the needs of customer
B. Continually learning
C. Managing cash flows
D. Exploiting technology to produce goods and services
Answer : C

8. Material Requirement Planning can be performed at?
A. Single Item –single Level & Plant
B. Routing Level
C. None of the above
D. All of these
Answer : A

9. To use SAP F&R, which of the following master data should exists in the system?
A. Product
B. Supply network
C. Calendar
D. Procurement cycle
E. All of these
Answer : E

10. When goods are issued, system decreases the inventory of components at the storage location in Production Planning system?
A. True
B. False
Answer : A